Language:

Servicehotline: +49 30 8145 264 0

Investors’ Day

Bank representatives, investors, manufacturers and distributors convene at PI Berlin for an Investors’ Day once a year.

Together with high-profile guest speakers, PI Berlin discusses new research results and analyses ways to reduce risks. In addition to the discussion and lectures, PI Berlin invites the participants to take a tour around the PV test laboratory. That tour offers insight into many aspects of quality control and gives the opportunity to see first-hand why and how the tests are performed.

60% of an investment in a PV power plant is for the purchase of module. For this reason, banks and investors must be able to rely on receiving high quality modules. It is necessary to ensure the modules will achieve the highest possible yields over the life of the project without major damage or production deficits. In order to ensure this long-term performance, modules should undergo the full spectrum of tests available, including those beyond the IEC standards.

Newsflash

Pre-Build Module Checks

A short article in NewEnergyUpdate: PV about the importance of checking modules before they are deployed in the field.
Outlining the key aspects of this part of quality control. Article


Press Release

Lars Podlowski joins the Board of Directors at the Photovoltaik-Institut Berlin


Press Release

Photovoltaik-Institut Berlin develops EVA film test


Press Release

Photovoltaik-Institut Berlin verifies impact of cleaning robots
Significant yield losses caused by sand and fine dust


Press Release

Solar Energy UK:
The BBA and Photovoltaik-Institut Berlin present new rating report service for solar power plants